Clients
Talk with our clients. Ask about our track record. You’ll hear that in addition to safety records we set high expectations for ourselves on every front including: exceptional workforce, dependability, cost efficiency, and environmental protection. Our dedication to quality has made Absolute Pipeline an Industry leader. We are committed to being the single-source provider for your pipeline maintenance and construction solutions and providing them in a cost efficient manner.
Our projects are well planned and professionally engineered. Our employees are experts in their fields and knowledgeable about each project. Our equipment is state of the art and well maintained. Our projects are completed on-schedule and within budget. These are just some of the reasons our clients see us as more than exceptional contractors – they consider us trusted partners.
Featured Projects
Facility Maintenance & Construction
Koch Pipeline - Caldwell, TX
Absolute Pipeline constructed this tank farm and truck unloading station.
Read more
Facility Maintenance & Construction
Koch Pipeline - Caldwell, TX
Absolute Pipeline constructed this tank farm and truck unloading station. This project included a meter skid, containment walls and hydro-test. We also installed 1,500’ of 8” and 12” of new pipeline construction.
Turnkey Pipeline Construction
McCutchin Petroleum Corporation – Cotulla, TX
Absolute Pipeline installed this 9 miles of 12" for McCutchin Petroleum in the Cotulla area.
Read more
Turnkey Pipeline Construction
McCutchin Petroleum Corporation – Cotulla, TX
Absolute Pipeline installed this 9 miles of 12" for McCutchin Petroleum in the Cotulla area.
The job took a total of 2 months from start to finish. It was completed on time and under budget.
ROW Mowing and Reclamation
Pipeline Operators of Texas – Sulpher, TX
Absolute Pipeline reclaimed the right of way for an old 8" line.
Read more
ROW Mowing and Reclamation
Pipeline Operators of Texas – Sulpher, TX
Absolute Pipeline reclaimed the right of way for an old 8" line. The line had been abandoned for 8
years. The job included hydro mulching, canopy trimming, erosion control, re-seeding, line locating and reinstalling line markers.
Oilfield Service
EOG Resources – Tilden, TX
Absolute Pipeline built 2 pad sites and 1 mile of road for EOG Resources in the Eagle Ford shale near Tilden.
Read more
Oilfield Service
EOG Resources – Tilden, TX
Absolute Pipeline built 2 pad sites and 1 mile of road for EOG Resources in the Eagle Ford shale near Tilden. This project included 20,000 tons of rock and gravel, fence building, cattle guard installation, water hauling, frac pit construction, drilling rig set up, compaction and aerial photography.
Maintenance and Integrity Services
Koch Pipeline – Port Arthur, TX
Absolute Pipeline rehabbed 7 miles of 12” for Koch.
Read more
Maintenance and Integrity Services
Koch Pipeline – Port Arthur, TX
Absolute Pipeline rehabbed 7 miles of 12” for Koch. This project
included integrity digs, cut outs, hydro-test and horizontal directional
drills (HDD). We also performed smart tool runs (pig runs) and finished
by commissioning with benzene.
For a complete list of client references please contact Clayton Reaser at Clayton@AbsolutePipeline.com or call 409-736-9004 Thank you